$2,590 in Package Add-ons

  • Twin Panel Panoramic Moonroof ($1,495 value)
  • Spray-In Bed Liner ($625 value)
  • 3.55 Electronic Locking Axle Ratio ($470 value)

Key Features

Browse the highlighted features available on this 2026 Ford F-150 King Ranch, including advanced technology, safety systems, premium amenities, and driver-focused conveniences that add value to your ownership experience.

Navigation
Provides turn-by-turn directions and route guidance to help simplify daily drives and road trips.
Moonroof/Sunroof
Enjoy fresh air, natural light, and an open-air feel at the touch of a button.
Back-up Camera
Provides a clear view behind the vehicle when reversing. Makes parking and maneuvering in tight spaces easier and more confident.
Blind Spot Monitoring
Helps detect vehicles traveling in adjacent lanes that may be difficult to see. Alerts provide added awareness during lane changes.
Trailer Tow
Equipped for added towing capability, helping you haul trailers, boats, campers, or recreational gear.
Sync
Ford SYNC connects your phone, music, navigation, and vehicle controls through voice commands or touchscreen access.
Adaptive Cruise Control
Helps maintain a preset following distance from the vehicle ahead by automatically adjusting speed. This can reduce fatigue during highway driving.
Android Auto
Connect your compatible Android smartphone to access navigation, music, calls, messages, and apps through the vehicle touchscreen.
Apple CarPlay
Integrates your iPhone with the vehicle infotainment system for easy access to maps, music, calls, and messages.

Vehicle Features

Convenience

  • With the adaptive cruise control activated, the vehicle will use cameras and/or navigation data to automatically slow down for curves in the road ahead that may be too sharp for the current set speed.
  • If the vehicle detects prolonged driver unresponsiveness it will automatically bring the vehicle to a stop and turn on the hazard lights.

Safety and Security

  • Steering assist and/or lane centering will maintain the vehicle's position within the lane with minimal input from the driver.
  • The vehicle constantly monitors the roadway in front of the vehicle and identifies and tracks pedestrians on an interior display.
  • The vehicle is equipped with a camera that displays an image of the area behind the vehicle on an interior display.
  • An active lane departure system alerts the driver of unintended movement of the vehicle out of a designated traffic lane and automatically maintains the vehicle's position within that lane using countermeasures such as braking and/or steering.
  • The vehicle is equipped with a system that senses, and then prepares, the vehicle and/or occupants, for an impending rear collision.

Technology and Telematics

  • Mobile devices can wirelessly connect to the internet through the vehicle's private mobile network.

Get Pre-Approved

No Credit Check
No Credit Check
No impact on your credit score

Immediate Decision
Immediate Decision
Get a Pre-Approval decision in seconds

Vehicle Specs

Exterior Color
Agate Black/Marsh Gray
Interior Color
Norias/Mesa
Bodystyle
Crew Cab Truck
Engine
3.5l V6 Ecoboost
Transmission
ELECTRONIC 10-SPEED AUTOMATIC
Drivetrain
4x4
Odometer
10
VIN
1FTFW6L82TFA86328
Stock Number
4004779

Well-Equipped Vehicle

Well-equipped vehicle with $2,590 in Package Add-ons.
View Package Add-ons

Experience Better Benefits

Commission-Free Certified Guides

Anderson Certified Guides are not paid on Commission, rather, Guides are paid to find you the perfect vehicle and give you a great experience.

5-Day Return or Exchange Policy

If you are not happy with your Anderson Auto Group vehicle, bring the vehicle back within 5 days and under 200 miles and exchange it or get a full refund subject to the conditions.

Collision Deductible Reimbursement

In the event of a collision incident, where your insurance is handling the repairs to the Anderson Auto Group vehicle, this policy will reimburse you for up to the first $500 of your deductible.

Description

This Agate Black/Marsh Gray 2026 Ford F-150King Ranch is a great choice! Checkout the following:

City17/HWY 23



ENGINE: 3.5L V6 ECOBOOST, AGATE BLACK METALLIC


Spray-In Bed Liner ($625 value)

    3.55 Electronic Locking Axle Ratio ($470 value)

      Twin Panel Panoramic Moonroof ($1,495 value)

      • Includes twin panel power panoramic moonroof with map lights and moonroof switches.



      Convenience

      • With the adaptive cruise control activated, the vehicle will use cameras and/or navigation data to automatically slow down for curves in the road ahead that may be too sharp for the current set speed. It will accelerate back to the set speed when the road straightens out.
      • If the vehicle detects prolonged driver unresponsiveness it will automatically bring the vehicle to a stop and turn on the hazard lights. If equipped, emergency services will be contacted.

      Safety and Security

      • Steering assist and/or lane centering will maintain the vehicle’s position within the lane with minimal input from the driver. This feature enables the vehicle to drive semi-autonomously on highways without the driver having to keep their hands on the wheel, however they must be ready to resume control of the vehicle at any point.
      • BlueCruise hands-on cruise control with lane change
      • The vehicle constantly monitors the roadway in front of the vehicle and identifies and tracks pedestrians on an interior display. If the system determines a likely impact, it will automatically take preventative steps to avoid hitting the pedestrian.
      • The vehicle is equipped with a camera that displays an image of the area behind the vehicle on an interior display.
      • An active lane departure system alerts the driver of unintended movement of the vehicle out of a designated traffic lane and automatically maintains the vehicle’s position within that lane using countermeasures such as braking and/or steering. If the driver uses the turn signals, the system is temporarily disabled.
      • The vehicle is equipped with a system that senses, and then prepares, the vehicle and/or occupants, for an impending rear collision.

      Technology and Telematics

      • SYNC 4 AppLink/Apple CarPlay/Android Auto smart device wireless mirroring
      • Mobile devices can wirelessly connect to the internet through the vehicle’s private mobile network.


      New 2026 Ford F-150 King Ranch for Sale in

      Discover the power and capability of the New 2026 Ford F-150 King Ranch at Anderson Ford of Lincoln South in . Whether you're shopping from or beyond, this new F-150 offers the performance, comfort, and reliability drivers count on.

      Visit our dealership in to explore this New Ford and more. We proudly serve the area with an unbeatable selection of cars, trucks, and SUVs.

      Questions About This New 2026 Ford F-150 King Ranch

      This new 2026 Ford F-150 King Ranch is listed at Anderson Ford of Lincoln South in . Availability can change quickly, so we recommend confirming price and availability before visiting. Stock #4004779.

      The current listed price for this 2026 Ford F-150 King Ranch is $67,577. Pricing, rebates, discounts, taxes, fees, and availability may change, so contact Anderson Ford of Lincoln South to confirm the most up-to-date price.

      Yes. You can schedule a test drive for this 2026 Ford F-150 King Ranch at Anderson Ford of Lincoln South in . A test drive is the best way to experience the comfort, technology, performance, and features of this vehicle.

      Schedule Test Drive

      This 2026 Ford F-150 King Ranch may include comfort, convenience, safety, performance, and technology features depending on its equipment and trim level. This Ford F-150 includes popular features such as Navigation, Moonroof/Sunroof, Back-up Camera, Blind Spot Monitoring, and Trailer Tow. Review the vehicle details above or contact Anderson Ford of Lincoln South for a full feature walkthrough.

      Yes. Anderson Ford of Lincoln South accepts trade-ins and can help estimate your vehicle's value. You may be able to apply your trade-in value toward the purchase of this 2026 Ford F-150 King Ranch.

      Yes. Financing options may be available for qualified buyers through Anderson Ford of Lincoln South. Terms can vary based on credit approval, lender programs, down payment, vehicle price, and available incentives.

      This 2026 Ford F-150 King Ranch is available through Anderson Ford of Lincoln South, serving drivers in and the surrounding area. Contact the dealership to confirm the vehicle's exact location before stopping in.

      Protect your vehicle

      From the minor dents to mechanical breakdowns - these products have you covered.

      Protect your vehicle
      Vehicle Service Contracts
      Vehicle Service Contracts

      Imagine driving with complete peace of mind, knowing that unexpected mechanical breakdowns won’t derail your plans or your budget. You deserve a service contract that is simple, straightforward, and provides valuable protection when a breakdown occurs.

      Term Protect
      Term Protect

      Nothing looks worse on your new car than the damage caused by tree sap, road salt, bird waste and other environmental elements.

      EV Vehicle Service Contract
      EV Vehicle Service Contract

      The cost of routine maintenance is an expense no one likes. Select from a variety of Maintenance Plans to cover the cost of routine maintenance.

      Bundle 109 (Tire & Wheel, Paintless Dent Repair, and Key Replacement)
      Bundle 109 (Tire & Wheel, Paintless Dent Repair, and Key Replacement)

      Protect yourself from everyday mishaps with our Tire & Wheel, Key Replacement, and Paintless Dent Repair (PDR) coverage. This package helps cover the cost of tire and wheel damage from road hazards, lost or damaged keys with 24/7 lockout assistance, and repairs minor dents and dings to keep your vehicle looking its best.

      GAP Coverage
      GAP Coverage

      GAP Coverage offers peace of mind by helping cover the difference between your insurance payout and the remaining balance on your loan or lease if your vehicle is totaled, stolen, or damaged beyond repair. Without it, you could be left paying out of pocket for a vehicle you no longer have. GAP protection bridges that financial gap so you're not stuck with the bill.

      Windshield Repair/Replacement
      Windshield Repair/Replacement

      Our Windshield Repair/Replacement coverage helps keep your view clear and your vehicle protected. Small chips, stars, and cracks can be quickly repaired with a specialized sealant, and if the damage can’t be fixed, your windshield will be replaced. It's a simple solution for unexpected glass damage.

      Pricing and Availability Conditions
      Price does not include tax, title, and license fees as well as a $299 Administration Fee for vehicle purchases. All pricing and details are believed to be accurate, but we do not warrant or guarantee such accuracy. The prices shown above, may vary from region to region, as will incentives, and are subject to change. New vehicle pricing reflects rebates to dealer when financing through Ford. With approved credit. Not all will qualify. Vehicle information is based off standard equipment and may vary from vehicle to vehicle. Call or email for complete vehicle specific information.